Ability to add Received Date in Conditions

Ability to add Received Date in Conditions

PermAssist have now given the ability to add / edit Received Date in Building Permit and CFI/OP Condition section.

What's New?
Ability to add Received Date in Building Permit and CFI/OP Condition section.

How does it work? 
Let see how we can add Received Date in Building Permit Condition.
Steps
1.)Open an application in app list and select Building Permit Condition as in the following screenshot.


2.) Go to the Building Permit Condition Section and click on edit option of a condition as following.
     
3.) Then you can add the date received and submit as following.
     
4.) After submitting you can add the Date to the selected condition.
   
5.) Now you can add the Date Received for all conditions in the section for that you need to select all the conditions and click on Update          Date Received Button.
     

6.) Then you can give the Date Received to the Text box as in following Screenshot And submit.
     

7) After submitting you can get the Date Received for all the conditions that you have selected.
    

 In the CFI/OP Condition section we following the same process as in Building Permit Condition Section.
 You need to follow the following steps for CFI/OP Condition section.
  Steps
  1.)Open an application in app list and select CFI/OP Condition as in the following screenshot.
      

    2.) Go to the Building Permit Condition Section and click on edit option of a condition as following.
     

3.) Then you can add the date received and submit as following. 
    

4.) After submitting you can add the Date to the selected condition. 
   
5.) Now you can add the Date Received for all conditions in the section for that you need to select all the conditions and click on Update          Date Received Button.
     

6.) Then you can give the Date Received to the Text box as in following Screenshot And submit.

 

7) After submitting you can get the Date Received for all the conditions that you have selected.


This is how you add Received Date in Building Permit and CFI/OP Condition section.

How can I enable it? 
The feature is enabled by default.
  
  
  

    • Related Articles

    • Release Notes Date 6th May 2020

      Just to let you know how it's to be an IT Professional during the Coronavirus outbreak........Do you remember when the Titanic was sinking and the band kept playing till the end? and the PermAssist team is the part of that band...We die like Real ...
    • Release Date: 07 June 2019

      VBA Legislative Changes - For Victorian Customers 1. Application Validation  A new function is now available under Application details through which application can validated to check if all the details required by BAMS (VBA) are filled into the ...
    • Selecting Building Approval Conditions in PA

      You could be able to Select BA Conditions from the Application.  1. Open up an application and go to the Building Approval Condition section. 2. Here, you can add Conditions like below; 3. Select the Conditions and click on "Submit". Added BA ...
    • Release Notes Date 04 March 2020

      Thanks to a few tweaks to the engine, a polish of the pistons, and recalibrated valves, the PermAssist should be running smoother than before. This month's maintenance release includes few notable features in addition to our regular tweaks, ...
    • Date Formatting for Merge Fields

      Please follow listed steps to format the Date Merge fields. Toggle the merge field by right click on the merge field. 2. You have to delete the star mark followed by the forward slash before adding the format. 3. Add the required format inside the ...