Date Formatting for Merge Fields

Date Formatting for Merge Fields

Please follow listed steps to format the Date Merge fields.

  1. Toggle the merge field by right click on the merge field.



                  







      

       2. You have to delete the star mark followed by the forward slash before adding the format.


                              

                  


      3. Add the required format inside the double quotes after the at (@) sign followed by the backward slash.


                  

Different Types of Date Formats:

"@dd/MM/yyyy" = "12/05/2023"
"@d MMMM yyyy" = "12 May 2023"
"@d/MM/yy" = "12/05/23"
"@yyyy-MM-dd" = "2023-05-12"
"@d-MMM-yy" = "12-May-23"



    • Related Articles

    • How to add Merge Fields to PDF

      Please find below guide to add Merge Fields to PDFs. 1. Open the PDF file in Nitro Pro. 2. Go to Forms > Click on TextField to add TextField to PDF. 3. Now RightClick on the newly added TextField and go to Properties. 4. Add the merge field in Name ...
    • Release Date: 07 June 2019

      VBA Legislative Changes - For Victorian Customers 1. Application Validation  A new function is now available under Application details through which application can validated to check if all the details required by BAMS (VBA) are filled into the ...
    • Release Notes Date 04 March 2020

      Thanks to a few tweaks to the engine, a polish of the pistons, and recalibrated valves, the PermAssist should be running smoother than before. This month's maintenance release includes few notable features in addition to our regular tweaks, ...
    • Release Date: 12 July 2019

      VBA Legislative Enhancements- For Victorian Customers 1. RBS pay Levy on behalf of applicant option A new function is now available under system admin > licence details section,that is to set Default RBS Pay Levy on behalf of Applicant and this ...
    • Ability to add Received Date in Conditions

      PermAssist have now given the ability to add / edit Received Date in Building Permit and CFI/OP Condition section. What's New? Ability to add Received Date in Building Permit and CFI/OP Condition section. How does it work?  Let see how we can add ...